Northern Shaanxi project department profile.
The project department has 12 senior engineers with horizontal well、 deep well,To 8-12 key wells、Complex well, deep well, horizontal well to provide technical services at the same time,
32 with ordinary horizontal well、shale gas exploration wells、shale gas sealed coring wells、conventional directional wells、well service the ability to engineer。Can provide 35-40 wells times technical service work at the same time。

In 2013 completed a total of 102 wells drilled, the total footage of 332279 meters。
34 horizontal wells, the total footage of 123827 meters;
Directional wells 37, the total footage of 119331 meters;
Straight 19 wells, the total footage of 59119 meters;
Exploration of 12, the total footage of 30002 meters。

The year 2014:
Innovative use of Light density fiber slurry cementing technology。
Innovative use of Gel drilling fluid technology, the present good effect
Innovative use of Rett super fiber hole cleaning process, the present good effect。
Shale gas wells set a new record in the YanChang area construction, remarkable economic benefit。

The project department focus on the introduction of the application of new drilling fluid system and new products, with the concept of technology innovation, and gradually improve the technical scheme, the drilling fluid formulation is suitable for screening, based on competition environment, and constantly improve the level of operations, professional mud company forward。

The project department has domestic and foreign key well, complicated well drilling fluid technology service experience and technical strength (key risk exploration wells such as Sinopec's key risk exploration well Tashen 1 well, PetroChina's key risk exploration wells 1 wells in Tarim Oilfield JIANMENGUAN, the deep well 1 grams, 2 grams of deep wells, horizontal wells in Northern Shaanxi area key Jing Ping Jing 74-6H1 well, 65-8H well, South Shengli Oilfield unconventional well pile 23 blocks), is a hard-working, tough team。